Skype
drilling.hose66

WhatsApp
008618031853252

Email
bella@rotarydrillinghose.com

Drilling grouting reinforcement considerations

      Improper handling of various drilling oil pipes can easily reduce the drilling effect or cause other accidents. For such problems, drilling grouting reinforcement must be implemented in advance. As a professional oil casing manufacturer, it analyzed and studied various situations and measures encountered in actual work.
First, the selection of grouting material
     When the drilling technology requirements are low, cement can be selected as the grouting material. For reinforcement and clogging, expansion plugging materials are often chosen, and materials with water blocking properties are typically selected for drilling water. The water-cement ratio is determined based on the selected grout pump, material usage instructions and actual results.
Second, drilling grouting and sealing
Due to the technical requirements of drilling, it is necessary to drill the borehole oil pipe and grout and pipe cement. Different grouting methods can be used depending on the inclination and use.
1. When the technical requirements for elevation drilling are low, the grouting pipe can be directly buried between the casing and the rock wall, and the grouting pipe can be fixed after pre-sealing.
2, the elevation angle drilling technology requirements are high, the length and length of the grouting pipe between the pre-buried hole sleeve and the rock wall are required (the short pipe length is generally 3 to 5 meters, and the long pipe length is generally smaller than the hole sleeve 0.5 m. After pre-sealing) Firstly, the short pipe low pressure grouting and solid pipe shall be implemented, and the long pipe high pressure grouting and solid pipe shall be implemented after the initial grouting solidification.
3. When the lower corner drilling technical requirements are lower, the casing shall be firstly laid at a depth of 2 meters below the predetermined depth of the oil casing. Then, the casing is constructed (taking into account the depth of rock dust deposition). The mud solid pipe is directly poured between the casing and the rock wall. It should be noted that the semi-fluid slurry must be poured first to block the gap at the bottom of the casing.
 


Friendly Reminder

CONTACT丨WAYS

  • Skype:drilling.hose66
  • WhatsApp:008618031853252
  • Telephone:+8631189849942
  • Email:bella@rotarydrillinghose.com
Home
Whatsup
Message
Contact